View all publications

Final report and decision of the Board of Inquiry into the Turitea wind farm proposal

Publication date:  September 2011
Publication reference number:  EPA 26

In August 2008, Mighty River Power Ltd lodged resource consent applications to construct, maintain and operate a wind farm in the Turitea Reserve and adjoining farmland near Palmerston North. The Minister for the Environment called in the applications and referred them to an independent Board of Inquiry.

The Board of Inquiry has released its final report and decision on the Turitea Wind Farm Proposal.

The Draft Report was released on 11 February 2011 with comments on this report being extended to 60 working days at the request of MRP. All parties were also given the opportunity to make any final comments on a number of matters raised in MRP’s comments on the Draft Report, in particular on the National Policy Statement on Renewable Energy Generation and MRP’s request to reinstate and/or add up to 12 turbines over and above the number decided on by the Board in its Draft Report decision. All of this resulted in an extended period between the time of the release of the Draft Report and the publication of this Final Report.