1. The consent holder shall be responsible for all contracted operations relating to the exercise of this resource consent, and shall ensure that all personnel working on the site are made aware of the conditions of this resource consent and the Construction Management Plan required under this consent, and shall ensure compliance with those conditions.
2. A copy of this resource consent shall be available to contractors undertaking the works at all times that physical works authorised by this consent are being undertaken, and shall be produced without unreasonable delay upon request from a servant or agent of the Auckland Regional Council (ARC).
3. The consent holder shall appoint one or more representatives prior to the exercise of this resource consent, who shall be the Auckland Regional Council’s principal contact person(s) in regard to matters relating to the construction works. At least 10 days prior to the works authorised by this consent, the consent holder shall inform the Manager1 of the representatives’ names and how they can be contacted within the works period. Should the person(s) appointed as representative(s) change during the works period, the consent holder shall immediately inform the Manager and shall also give written notice to the Manager of the new representatives’ names and how they can be contacted.
4. The consent holder shall provide designs of the specific structures, and the intended construction methodology, in sufficient detail for the size, location and likely effects to be determined, to the Manager for approval at least 1 month prior to the commencement of construction.
5. If works affecting the beds of watercourses are not completed, or substantially completed, within 5 years of the date of commencement of this consent in terms of section 116 of the Act, the consent holder shall resubmit the designs of the specific structures, and intended construction methodology required by condition 4, including an updated timetable, to the Manager for further comment and approval.
6. The Manager shall be informed in writing at least one week prior to the start date of any works authorised by the resource consents.
7. Prior to works commencing on-site, the consent holder or their agent shall arrange and conduct a pre-construction site meeting between ARC, the consent holder, the primary contractor and a representative of Manukau City Council. If the construction is undertaken on a staged basis, a pre-construction site meeting may take place prior to each stage.
8. A Construction Management Plan shall be prepared and have the purpose of ensuring that the activities within consent numbers 34102, 34370, 34372 and 34373, are managed in an integrated and effective manner, and in accordance with the conditions of each consent. The Construction Management Plan shall outline the consent holder’s intended approach to (as appropriate):
9. The Construction Management Plan shall be submitted for the written approval of the Manager, acting in a technical certification capacity, following consultation with the Manukau City Council. The works authorised by this consent shall not be commenced prior to such approval of the Construction Management Plan.
10. Any changes to the Construction Management Plan shall be made in accordance with the methodology and approved procedures in that plan and shall be confirmed in writing by the consent holder following consultation with the Manager, before implementation
11. The consent holder shall carry out operations in general accordance with the provisions of the approved Construction Management Plan.
12. The consent holder shall provide the Manager with an updated schedule of construction activities, completed for the previous month and intended for the following month, at the end of each month during the duration of the works.
13. No contaminant (including but not limited to oil, petrol, diesel, hydraulic fluid) shall be released into water from equipment being used for the activity and no machinery shall be cleaned, stored, or refuelled within 10 metres of the stream.
14. Any erosion of the stream bed or banks that is attributable to the works shall be repaired by the consent holder to the satisfaction of the Manager.
15. All works affecting the stream, including tidy up on completion of the works, shall be to the satisfaction of the Manager.
16. The consent holder shall ensure that:
17. During the implementation of the works within the Turanga Creek, the Mangemangeroa Stream and the unnamed stream above Dunvegan Rise and below Point View Drive, the consent holder shall take all practicable steps to minimise sediment loading and increased turbidity of the watercourses, including but not limited to:
18. The bridge over the Turanga Creek shall be constructed and maintained to ensure that:
19. If a bridge crossing is chosen for the Mangemangeroa Stream and the unnamed stream above Dunvegan Rise and below Point View Drive, then the bridge shall be constructed and maintained to ensure that:
20. If culvert crossings are chosen for the Mangemangeroa Stream and the unnamed stream above Dunvegan Rise and below Point View Drive, then the culvert shall be designed and installed to provide uninterrupted fish passage upon completion in accordance with TP 1312 .
21. The option chosen (bridge or culvert) for the Mangemangeroa Stream and the unnamed stream above Dunvegan Rise and below Point View Drive, shall not cause flooding or increase existing levels of flooding on neighbouring private properties.
22. The option chosen (bridge or culvert) for the Mangemangeroa Stream and the unnamed stream above Dunvegan Rise and below Point View Drive shall not cause more than a minor impediment to the passage of flood debris and shall be maintained free of flood debris during the construction period.
23. Environmental protection measures shall be carried out in accordance with those generally described in consents numbers 34102, 34370, 34372 and 34373 and the Construction Management Plan required in condition 8 and the Erosion and Sediment Control Plan required under consent number 34102, and TP90.3
24. Any resulting amendments to the environmental protection methodologies proposed in consents numbers 34102, 34370, 34372 and 34373 and the Construction Management Plan may be reviewed by ARC during the pre-construction meeting(s) specified under condition 7 and shall be approved in accordance with the procedures set out in that plan.
25. The consent holder shall protect and manage archaeological sites in a manner consistent with the provisions of the Construction Management Plan, as follows:
Known archaeological sites
(a) All relevant known archaeological sites have been identified in the documentation relating to the Notices of Requirement for the Upper North Island Grid Upgrade Project, 2008.
Unknown archaeological sites
(b) In the event of archaeological evidence being uncovered (eg, shell, midden, hangi or oven pit depressions, defensive ditches, artefactual material or human bones), work is to cease in the vicinity of the discovery and a suitably qualified archaeologist is to be contacted so that appropriate action can be taken before work can recommence at the discovery site.
26. Any wāhi tapu that is reasonably expected to be impacted by works associated with this consent is to be addressed in accordance with the document entitled Transpower North Island Grid Upgrade Project Draft Protocol for Dealing with Kōiwi or Taonga Unearthed During Construction and the Discovery of Sites of Significance, Wāhi Tapu, Heritage Sites and Archaeological Sites, or its subsequent version.
27. Should the consent holder cease or abandon work on-site, it shall first take adequate preventative and remedial measures to control sediment discharge or other damage including slipping, slumping or erosion, and shall thereafter maintain these measures for so long as necessary. All such measures shall be of a type, and to a standard, which are to the satisfaction of the Manager.
Note: This condition does not apply to normal staging of work.
28. The conditions of this consent may be reviewed by the ARC pursuant to section 128 of the Resource Management Act 1991, by the giving of notice pursuant to section 129 of the Act, in December 2009 and every December thereafter:
1. Manager for the purpose of this consent means the Manager, Sediment Consents and Consents Compliance, ARC (or nominated ARC staff acting on the Manager's behalf).
2. ARC Technical Publication No 131, Fish Passage Guidelines for the Auckland Region, 2000
3. ARC Technical Publication No 90, Erosion and Sediment Control Guidelines for Land Disturbing Activities in the Auckland Region, March 1999.