Pakuranga Substation

2519.     The requirement for a designation for the Pakuranga Substation in the Manukau City District Plan is confirmed on the terms and subject to the conditions set out below.

Description of works

2520.     The designation is for the ongoing use, maintenance and operation of the Pakuranga Substation, the development of the substation site as part of the upper North Island Grid Upgrade Project, involving the replacement, operation and maintenance of the existing substation and the construction of a new 220-kV substation, installation of 220-kV underground cable circuits and associated works, and works associated with other upgrade projects, and ancillary activities.

2521.     The nature of the works is described more particularly in Part III (excluding section 12 in relation to suggested conditions), and also in Parts II and X of the Notices of Requirement Documentation (dated April 2007).

Land subject to the designation

2522.     The designation applies to the land shown in “Figure 1 Pakuranga Substation Designation” being page 3 of Part III of the Notices of Requirement Documentation (dated April 2007) and listed in table 1.

Table 1: Legal description of land parcels for Pakuranga Substation

Parcel ID Legal Description Title Local Authority
4989690 Pt Lot 1 DP 143331 NA102B/365 (Part Cancelled) Manukau City
5065543 Lot 2 DP 167430 NA102B/365 Manukau City
4829154 Lot 146 DP 168165 NA102B/365 Manukau City
4999945 Lot 77 DP 168324 NA102B/738 Manukau City
4789305 Lot 81 DP 168324 NA102B/742 Manukau City
4787645 Lot 82 DP 168324 NA102B/743 Manukau City

Lapse

2523.     The designation shall not lapse for a period of 15 years after incorporation in the Manukau City District Plan.

Conditions

2524.     The designation is subject to the conditions set out in Appendix C.

 

|