
10.58 am
STOP 6: BOTANY HUB - View of Pakuranga Sub-station
Parties present: Archana Devi, Howard Wright.
Notes: Archana Devi points out where the proposed underground cable would run from Te Irirangi Drive to the sub-station, and points out the existing termination towers.
Return to the point in the document where this image is located.
Last updated: 25 September 2008