Table 5: Net present value of options with New Hydro installed (7.5% discount rate, 30 year period of analysis) ($million) (irrigation minus New Hydro outcome)

Return to the point in the document where this table is located.

Irrigation Demand

(New Hydro installed)

Irrigation Area (ha)

Water used (cumecs)

Net present value

Net Regional

Regional Primary Production

Regional Energy

All Irrigation Demands

124,250

24.1

-$73.9m

$247.0m

-$320.8m

All Irrigation Demands >5% IRRa

76,250

16.7

-$32.2m

$104.7m

-$136.9m

Takes above Tekapo

30,000

4.0

-$16.0m

$105.8m

-$121.8m

Takes above Ohau

10,000

1.9

-$19.5m

$26.2m

-$45.6m

Takes above Benmore

2,000

0.4

-$2.0m

$4.9m

-$6.9m

Takes Below Waitaki Dam

44,500

9.6

-$3.5m

$67.3m

-$70.7m

Below Waitaki integrated with.New Hydro

44,500

9.6

$28.7m

$85.8m

-$57.1m

 

 