Table 5.1: Summary of current and projected demands from the Waitaki Catchment (low growth scenarios)

Return to the point in the document where this table is located.

Location of demand

Current peak flow range
(flows-consents)
[Where a range is given it indicates that estimates from both recorded flows and consents are included.]
(l/s)

Current annual range
(flows-consents)
(000 m3/year)

Projected 2051 peak flow range
(flows-consents)
(l/s)

Projected 2051 annual range
(flows-consents)
(000 m3/year)

Current Waitaki [Current demand estimated for the Waitaki Catchment only using flow-population data.]

613

8,644

696

9,812

Current out-of-catchment [Current demand estimated outside the Waitaki Catchment using flow-population data.]

236

4,094

268

4,646

Current total [Current demand estimated using flow-population data and consents data.]

849-1172

12,738-13,856

964-1330

14,459-15,727

Future out-of-catchment [New takes that could be required by Mackenzie, Timaru, Waimate and Waitaki Districts.]

   

657

10,112

Future out-of-catchment (including DCC) [New takes that could be required by Dunedin City District.]

   

100

1,615

Total

849-1172

12,738-13,856

1721-2087

26,187-27,456

 

 

Return to the point in the document where this table is located.