Accessibility. Skip to main content.

Table 12: NPV (7.5%, 30 years) of former Order in Council area with uptake above Ohau A, new hydro installed

Return to the point in the document where this table is located.

Benefits

National

Primary production sector

Energy sector

Irrigation sector expansion

       

Increased agricultural output

$145 m

$145 m

$145 m

 

Total benefits

 

$145 m

$145 m

$0 m

Costs

       

Investment for irrigation

       

Off-farm infrastructure

$10 m

 

$10 m

 

On-farm infrastructure

$39 m

 

$39 m

 

On-farm transition

$18 m

 

$18 m

 

Operations and maintenance cost

$12 m

 

$12 m

 

Lost generation capacity

$138 m

$217 m

 

$138 m

Total costs

 

$217 m

$80 m

$138 m

Net present value 7.5%

 

-$72 m

$65 m

-$138 m

Net present value 10%

$0 m

-$57 m

$39 m

-$96 m

NPV @ 5%

$0 m

-$116 m

$107 m

-$224 m

NPV @ 12.5%

$0 m

-$50 m

$21 m

-$71 m

 

Return to the point in the document where this table is located.