Table E3: IBCs for hypothetical district landfill (Cell Construction Completed in Single Year)

Return to the point in the document where this table is located.

Scenario
Waste growth rate for population increase and per capita generation (% p.a.)
Waste reduction over life of facility and equivalent per annum reduction (% / % p.a.)
Net growth rate
(% p.a.)

Operating life (years)
Waste: initial base tonnage (tonnes)
Waste in final year (tonnes)
Total tonnage during operating life (tonnes)
IBC ($/tonne)

1

1.5

0/0

1.5 - 0 = 1.5

35

50,000

82,950

2,279,604

66.02

2

1.5

10/0.6

1.5 - 0.6 = 0.9

35

50,000

67,806

2,046,277

68.49

3

1.5

20/1.3

1.5 - 1.3 = 0.2

35

50,000

53,515

1,810,830

71.23

4

1.5

30/2.11

1.5 - 2.11 = -0.61

35

50,000

40,609

1,580,130

74.06

5

1.5

50/4.36

1.5 - 4.36 = -2.86

35

50,000

18,643

1,115,057

83.41

 