Table E2: IBCs for hypothetical district landfill (Cell Construction Staged in Equal Annual Amounts)

Return to the point in the document where this table is located.

Scenario Waste growth rate for population increase and per capita generation (% p.a.) Waste reduction over life of facility and equivalent per annum reduction (% / % p.a.) Net growth rate
(% p.a.)
Operating life (years) Waste: initial base tonnage (tonnes) Waste in final year (tonnes) Total tonnage during operating life (tonnes) IBC ($/tonne)

1

1.5

0/0

1.5 - 0 = 1.5

35

50,000

82,950

2,279,604

62.57

2

1.5

10/0.6

1.5 - 0.6 = 0.9

35

50,000

67,806

2,046,277

64.72

3

1.5

20/1.3

1.5 - 1.3 = 0.2

35

50,000

53,515

1,810,830

67.21

4

1.5

30/2.11

1.5 - 2.11 = -0.61

35

50,000

40,609

1,580,130

69.51

5

1.5

50/4.36

1.5 - 4.36 = -2.86

35

50,000

18,643

1,115,057

77.88

 