Table 8: Planning and pre-development

Return to the point in the document where this table is located.

Data cell What to input

Project management

Enter $ lump sum which is then equally distributed per year over the duration of the pre-development period.

Site selection

Enter $ lump sum.

Consultation

Enter $ lump sum.

Land pre-purchase/ pre-leasing agreements

Enter $ lump sum.

Survey and preliminary design

Enter $ lump sum.

Geotechnical and groundwater investigations

Enter $ lump sum.

Other detailed studies (noise, traffic, visual, archaeological, etc.)

Enter $ lump sum.

Baseline monitoring

Enter $ lump sum.

Resource consent process (AEE and consent application, draft landfill management plan, legal fees, hearing, and appeal)

Enter $ lump sum for each item.

Land acquisition and other associated costs

Enter $ lump sum.

Proceeds from the disposal of excess land

Enter $ lump sum.

 

 