| Data cell | What to input |
|---|---|
Sediment control structures and measures |
Enter $ lump sum. This sum will be applied to each cell. |
Clearing |
Enter $/m2. |
Clearing bush |
Enter $/m2. |
Perimeter road |
Enter $/m. |
Topsoil - cut to stockpile |
Enter $/m3. |
Unsuitables - cut to stockpile |
Enter $/m3. |
Sub-topsoil - cut to stockpile, stockpile to liner, cut to fill as liner, and borrow to fill as liner |
Enter $/m3. |
Low permeability material |
Enter $/m3. |
Structural material - cut to stockpile, stockpile to fill, cut to fill, and borrow to fill |
Enter $/m3. |
Groundwater control/subsoil drainage |
Enter $/m. |
Preparation of subgrade for laying liner |
Enter $/m2 for each liner type Set to zero where this feature doesn't apply to a particular liner type. Refer section 5.4.9 and the Typical Example in Appendix E |
Specialised subgrade treatment |
Enter $/m2. |
Liner supply and installation (synthetic) |
Enter $/m2 for each liner type. Set to zero where this feature doesn't apply to a particular liner type. Refer section 5.4.9 and the Typical Example in Appendix E |
Liner protection layer |
Enter $/m2 for each liner type. Set to zero where this feature doesn't apply to a particular liner type. Refer section 5.4.9 and the Typical Example in Appendix E |
Leachate collection: |
|
Leachate pre-treatment facility |
HDPE lined lagoon, aerators and temporary leachate collection and storage tanks - enter $ lump sum. |
Leachate disposal system |
Enter $ lump sum. |
Return to the point in the document where this table is located.