Table 6: Indicative cost/benefits for the case study university building

Return to the point in the document where this table is located.

 

Building type

Benchmark building capital cost
$/m2

ESD building capital cost
$/m2

ESD building premium (saving)
$/m2

ESD building premium (saving)
%

Annual energy cost savings
$/m2

Annual water cost savings
$/m2

Total annual cost savings
$/m2

Simple payback
(years)

20-year NPV for ESD measures
$/m2

University

2300

2000

-300

-15.0

6.3

0.0

6.3

N/A

-338

 

 