Skip to main content.

Figure 2: The IWBDP from project start-up through to commissioning, auditing and post-occupancy evaluation (POE) and the possible feedback loops (shown by the green arrows)

Return to the point in the document where this figure is located.

The IWBDP from project start-up through to commissioning, auditing and post-occupancy evaluation

Text description of figure

This figure highlights the iterative nature of the IWBDP and shows the focus towards the design objectives at every stage in the design from start-up through to occupancy.  Several possible feedback loops are identified throughout the process.

 

Return to the point in the document where this figure is located.

 

[ |