Figure 5: Flow chart for consent applications associated with pastoral land

Return to the point in the document where this figure is located.

 

Text description

The application is submitted to Council, information is checked if complete and if contamination issues were considered.

If contamination issues were not considered, request assessment of possible contamination (return)

If contamination issues were considered, was the site formerly a sheep farm?

Sheep Dip identification

If the site was not a sheep farm or it is uncertain, is the site history complete? (see Section 5.7)

If the site was not a sheep farm, request further information regarding past site use (return)

If the site was a sheep farm, is any indications of sheep dips?

If there are no indications of sheep dips, there are no further concerns regarding sheep dips

If there are indications of sheep dips, request identification of all possible sheep dip locations (see Section 4 and checklist Appendix 1) (return)

If the site was formerly a sheep farm, were sheep dips considered? (see Note 2)

If sheep dips were not considered, request identification of all possible sheep dip locations (see Section 4 and checklist Appendix 1) (return)

If sheep dips were considered, are all probable or actual dip locations identified? (see Note 3, and Section 3.4)

If all probably or actual dip locations were not considered or it is uncertain, request identification of all possible sheep dip locations (see Section 4 and checklist Appendix 1) (return)

If all probable or actual dip locations were considered, were any sheep dips identified?

If no sheep dips were identified, there are no further concerns regarding sheep dips.

If sheep dips were identified, see soil and water sampling information below.

Soil and water sampling

Appropriate chemicals identified and analysed? (see Note 4 and Section 2.3)

Appropriate sampling:

  • sampling locations?(see Note 5 and Section 5.4)
  • sample collection? (see Note 6 and Section 5.5)

Results assessed against appropriate guideline values? (see Section 5.6 and Appendix 6)

Was adequate investigation sampling carried out?

If adequate investigation sampling was not carried out or it is uncertain, request additional investigations to characterise site (return)

If adequate investigation sampling was carried out, is there an adequate investigation report? (see Section 5.7)

If there is no adequate investigation report, request clarification of incomplete report sections (return)

If it is uncertain about the investigation report, seek independent review (see Note 6). Any issues raised by review?

If there were no issues raised by the review, proceed with application assigning controls as necessary

If there were issues raised, address issues raised and reassess application

If there is an adequate investigation report, has adequate management and/or remediation been proposed? (see Section 6)

If adequate management and/or remediation has been proposed proceed with application assigning controls as necessary.

If adequate management and/or remediation has not been proposed or it is uncertain, seek independent review (see note 6) Any issues raised by review?

If there are no issues raised by the review, proceed with application assigning controls as necessary

If issues were raised by the review, address issues raised and reassess application

 

 

 

Return to the point in the document where this figure is located.