Figure A3C.1: Process for the development of LCDB2

Return to the point in the document where this figure is located.

Text description of figure

There are seven main steps in the development of LCDB2.

1. Image Acquisition

  • Summer 2001 / 2002

2. Image Processing

  • Pan sharpen ETM+ imagery to 15 m
  • Generate 15 m pixel DTM’s
  • Ortho-rectify imagery
  • Supply source imagery and ortho-rectified imagery to Project Manager

3. Spectral Integrity Check

  • Remove topographic effect to produce flattened imagery
  • Perform spectral integrity check of LCDB1 with flattened imagery
  • Highlight pixels that deviate from LCDB1 class
  • Supply spectral integrity check image to Project Manager

4. LCDB2 GIS processing (direct interaction with steps 5 and 6)

  • Correct LCDB1 classifications and generalisation errors
  • Confirm actual land cover changes between image dates
  • Code Type of land cover change
  • Supply and edit vectors for field check

5. Field Checking (direct interaction with steps 4, 6 and 7)

  • Verify draft land cover classes
  • Supply hardcopy of recommended edits of draft classification to contractors at stage 4

6. Accuracy Assessment (direct interaction with steps 4 and 5)

  • Decide on sampling intensity by class, acquire relevant aerial photography and ancillary data to complete the work
  • Publish accuracy assessment

7. Completed LCDB2

  • Deliver LCDB2 to stakeholders
  • Compile metadata
  • Distribute via database custodian
  • Write user manual