Text description of figure
There are seven main steps in the development of LCDB2.
1. Image Acquisition
2. Image Processing
- Pan sharpen ETM+ imagery to 15 m
- Generate 15 m pixel DTM’s
- Ortho-rectify imagery
- Supply source imagery and ortho-rectified imagery to Project Manager
3. Spectral Integrity Check
- Remove topographic effect to produce flattened imagery
- Perform spectral integrity check of LCDB1 with flattened imagery
- Highlight pixels that deviate from LCDB1 class
- Supply spectral integrity check image to Project Manager
4. LCDB2 GIS processing (direct interaction with steps 5 and 6)
- Correct LCDB1 classifications and generalisation errors
- Confirm actual land cover changes between image dates
- Code Type of land cover change
- Supply and edit vectors for field check
5. Field Checking (direct interaction with steps 4, 6 and 7)
- Verify draft land cover classes
- Supply hardcopy of recommended edits of draft classification to contractors at stage 4
6. Accuracy Assessment (direct interaction with steps 4 and 5)
- Decide on sampling intensity by class, acquire relevant aerial photography and ancillary data to complete the work
- Publish accuracy assessment
7. Completed LCDB2
- Deliver LCDB2 to stakeholders
- Compile metadata
- Distribute via database custodian
- Write user manual