Skip to main content.

Archived publication

This publication is no longer current or has been superseded.

Figure 4.2.1 CO2 emissions from cement production using Tier and Tier 2 methods

Return to the point in the document where this figure is located.

 

Text description of figure
Year

Tier 1 method (Gg CO2 equivalent)

Tier 2 method (Gg CO2 equivalent)

1990 366.662  
1991 343.3407  
1992 405.4102  
1993 461.1548  
1994 486.7511  
1995 503.3407  
1996 502.7542  
1997   503.361
1998   478.724
1999   521.078
2000   519.788
2001   523.978
2002   541.723
2003 4,014.19 527.471